DeploymentApril 10, 20267 min read

Launching robotaxis in a new city — a playbook

Launching robotaxis in a new city is the single most complex operational task in the AV industry. There is no playbook published anywhere that covers it end-to-end. Here is the six-phase model that we use, and the failure mode of each phase.

An Autzu Giga Hub exterior at a new-market deployment site, with the city skyline in the background.

Phase 1 — Survey and permitting

The market opens or closes at this phase. Operators apply for the appropriate state and city authorisations — California PUC TCP licenses, Arizona DOT TNC permits, Toronto PTC licenses, Texas TNC registrations — before anything else moves. The trap is treating permitting as a parallel work-stream rather than the rate-limiting step. Every other phase blocks on it.

Time budget: 3–9 months depending on the jurisdiction and the regulatory history of AV operations in that market.

Phase 2 — Hub siting

Real estate has to be locked in concurrent with permitting, because zoning and traffic-impact reviews take just as long as the regulatory approval itself. Operators that wait to find a site until they have the permit lose another 6–12 months. The site selection criteria are: utility capacity, zoning, traffic patterns to the service area, expansion options, and proximity to other operator infrastructure.

Failure mode: a great permit and no hub means a fleet of vehicles sitting in a temporary lot eating depreciation.

Phase 3 — Build-out

Electrical service is the long-pole item. Bringing the utility-scale service required for a 50–250 vehicle hub typically requires a substation upgrade or new transformer placement by the local utility, which is a 12–18 month process in most markets. Operators that have not started utility coordination before phase 3 are guaranteed to overrun.

In parallel: civil work, charging hardware installation, robotics installation, calibration lane fit-out, and back-of-house IT.

Phase 4 — Mapping and AV onboarding

Every AV operator runs a closed-course validation phase before opening the service area. HD mapping the service polygon, validating against local-language signage, edge-casing left turns in the dense parts of the city, and integrating with local emergency services dispatch all happen here.

This is the phase the AV operator owns. The infrastructure partner owns the hub fit-out, energy commissioning, software integration, and operations team hiring during this same window.

Phase 5 — Pilot operations

The pilot phase is not about miles driven. It is about exercising every workflow under realistic conditions: shift-change at the hub, peak-demand dispatch, edge-case interventions, off-hours maintenance, weekend volume, weather events. Operators that treat the pilot as a marketing event rather than an operational stress test fail when they move to revenue.

Time budget: 6–16 weeks.

Phase 6 — Scale to revenue

Revenue operations open with a fleet sized to the service-area demand, not to the maximum capacity of the hub. Day-one over-provisioning is the most common failure mode here — operators put 200 vehicles on the road in week one, run them at 25% utilisation, and burn through six months of margin before the demand catches up.

A staged ramp from 30 → 80 → 150 → 250 vehicles over the first nine months matches demand growth and keeps utilisation high. This is a fleet operations decision, not a marketing decision.

Where launches actually stall

  • Phase 1 — regulatory uncertainty stalls the entire project.
  • Phase 3 — utility service is late.
  • Phase 6 — over-provisioning crashes unit economics.

The other three phases are knowable problems with known answers. These three are the ones where operators that have done it before pull ahead of operators that have not.

References & further reading

  • California Public Utilities Commission — AV passenger service rulescpuc.ca.gov
  • Arizona Department of Transportation — Autonomous vehicle policyazdot.gov
  • NHTSA — Automated Vehicles for Safetynhtsa.gov
  • City of Toronto — Private Transportation Company (PTC) licensingtoronto.ca

Continue reading